March 98
INSTRUCTIONS FOR PREPARATION OF FEE PROPOSALS FOR ARCHITECT-ENGINEER SERVICE
1. Fees for services under an architect-engineer control will be paid in the
form of a fixed-price, resulting from a negotiated contract between the
Architect-Engineer (A/E) and the Project Director. Method and schedule of
payment of the fee and all other factors and conditions relating to it are
included in the typical A/E Contract and supplementary contract documents and
other information in the "A/E Package" given to the A/E(s) at the pre-
negotiation conference.
2. The A/E(s) will deliver his fee proposal to reach the Project Director at
least ten (10) working days before the negotiation meeting. He shall
thoroughly study and evaluate all of the information in the "A/E Package" and
apply all resources available to him to make a carefully considered contract.
The negotiation will involve a detailed analysis and comparison of the A/E's
estimated costs with estimates made by the VA.
3. The A/E(s) shall tabulate his proposal on the format of VA Form 08-6298,
"Work Form for A/E Fee Proposal". He will develop fee proposal for three
basic categories; the preparation of "Contract Drawings and Specifications",
Construction Period Services" and "Site Visits". Special Provisions
(Architect-Engineer Contract), describes the services required under each
basic category. Within each category the A/E(s) will break his costs down
into those costs to which "Overhead" and "Profit" allowances may be applied
and incidental costs no applicable to "Overhead" and "Profit". The A/E(s)
will estimate and tabulate the number of man hours required by all employees
and consultants who are expected to participate in the project with proper
recognition of the relationship and effort each will contribute to the
project. Hourly salary rates tabulated on the form shall be the certified
hourly salary rates previously submitted to the Project Director any may be
subject to verification by reference to the A/E's current payrolls and his
consultant's payrolls. Any difference between the tabulated hourly salary
rates and those currently being paid shall be fully explained and justified in
the submission. When overtime pay is included in the proposal it shall be
clearly identified and justified. If principals or partners take active roles
in the work under this contract, their rates of compensation that may be
allowed as direct costs will be limited to the rates of employees who would
otherwise be utilized for such services. Principals or partners shall
normally be compensated from the "Overhead" and "Profit" allowances.
4. Reimbursable Items: Items for which the A/E will be reimbursed for "Out-
of-pocket" expenses and that may not be included in the fee proposal are
professional services such as site survey, sub-surface investigations, etc.,
reproduction of contract drawings and specifications, mylars for record (as-
built) drawings, amendments and shop drawings, and mailing cost of bidding
documents and amendments.
5. Overhead: Overhead as used in this form means the allowable indirect
costs which cannot be directly allocated to the work although essential to the
performance thereof. The method of allocating overhead costs must be in
accordance with generally accepted accounting procedures. Detailed criteria
for the inclusion or exclusion of components of overhead are contained in FAR
31.205. However, in most instances the following costs are not allowable in
determining overhead: